Putting an RF connector on a circuit board looks easy and often goes wrong. The footprint, the ground vias and the transition from connector to trace decide how much of your signal survives. This guide covers PCB mount RF connector styles, how to design the launch and what to check during assembly.
The place where the signal moves from the connector pin to a PCB trace is the launch. A poorly designed launch has a changed impedance, extra capacitance from the pad or inductance from a long pin. At low frequencies this is irrelevant. At several GHz, the mismatch creates reflections and insertion loss. A well-designed launch keeps the impedance near 50 ohm by shaping the pad, the clearance to the ground plane and the via positions.
| Aspect | Edge launch | Through-hole vertical |
|---|---|---|
| Frequency capability | High, with tuned footprint | Medium |
| Assembly | Clamp then solder | Wave or reflow |
| Board space | Uses board edge | Uses board area |
| Mechanical strength | Good | Very good with legs |
| Cost | Higher | Lower |
Edge launch connectors can work well to 18 GHz or higher when matched to the stack-up and trace width. Through-hole connectors are simple and strong, and good for lower frequencies.
Request a Custom Cable Assembly Contact Our Engineers
A connector mated and unmated hundreds of times puts torque on the board. Use connectors with legs or a mounting plate for anything that will see regular handling. Give the board support near the connector in the enclosure. For right-angle connectors, consider the lever effect of the cable weight and add strain relief on the cable.
The connector body is a heat sink, so soldering takes more heat than a small component does. Use enough heat to wet the ground legs fully. Avoid solder flowing into the center pin socket. For edge launch, make sure the connector sits flat on the board and the center pin touches the pad before soldering. Inspect solder joints under magnification.
Measure the board with a VNA using a short test trace and a connector at each end. Compare return loss with the connector maker's evaluation board. Use time domain measurements to see where reflections come from. If reflections appear at the connector, adjust the pad or ground clearance and revise.
The cable assembly that mates with your board connector is part of the system. Pick the plug and cable to match your frequency and flexibility needs, and include strain relief. A good board launch can be spoiled by a poorly terminated cable.
An engineer places an edge launch SMA connector on a 1.6 mm FR-4 board for a 2.4 GHz test point. The connector's center pin must sit on the 50 ohm trace, the ground tabs must connect to the top and bottom ground planes with several vias, and the trace width must match the stack-up, about 3 mm for 50 ohms on typical FR-4. If the connector manufacturer gives a footprint, use it. A poor footprint can add a reflection that shows up as a return loss dip in the sweep.
Edge launch connectors mount on the edge of the board and make a clean transition from coax to microstrip, which is why they are common in test fixtures and RF boards. Vertical or through-hole connectors have pins that go through the board and are soldered. Surface mount connectors, such as U.FL, MHF4 and some MMCX, sit on pads. Right angle versions turn the cable away from the board.
| Type | Typical use | Frequency range |
|---|---|---|
| Edge launch SMA | Test points, RF boards | to 18 GHz or more |
| Through-hole SMA | Panel and board | to several GHz |
| U.FL and MHF4 SMD | Inside devices | to 6 GHz |
| MMCX SMD | Compact radios | to 6 GHz |
Keep the RF trace short and straight, with solid ground beneath. Stitch ground vias around the connector. Keep the footprint clear of other traces. Follow the manufacturer's land pattern and solder paste advice. Check the mechanical strength: a heavy cable on a small connector can tear pads, so support the cable.
SigmaRF builds the cable assemblies that mate with your PCB connectors, each swept on a VNA for VSWR and insertion loss from 100 MHz to 40 GHz. Small lots are welcome, with lead times as short as 2 days from Vadodara and Cleveland.